The Phase II stormwater regulations outline six (6) minimum control measures that all Phase II Permittees must address when establishing individual stormwater programs. The six (6) minimum control measures are:
- Public Education and Outreach
- Public Involvement and Participation
- Illicit Discharge Detection and Elimination
- Construction Site Stormwater Runoff Control
- Post-Construction Stormwater Management
- Pollution Prevention and Good Housekeeping